Essay / Analysis of PT Bukaka Teknik Utama - 761
So the production process should happen every day to meet the demand and the target production time is achieved or timely. The BRB (Bukaka Ramp Boarding Bridge) business unit uses Engineering To Order manufacturing systems to meet customer product specifications that require unique engineering design or significant customization, and the customer is usually involved in the product design. This unit also introduced a daily subcontracting system for malakukan this production process. The subcontracted labor is recruited from some of the company's existing labor suppliers, such as PT Musi Raya, PT Bagja Putra Sirait and PT Indo Utama star with a contract system. The problems that arise in production are the imbalance between the production process and the work caused by the definition and calculation of the amount of work which constitutes an unfavorable imbalance between workstations. This situation causes an accumulation of product/product waiting for the next process, the machine does not work, the operator/worker unemployed therefore the production process is not smooth and the planning that has been done often does not correspond to the real conditions on the ground. and may cause delays in the scheduled time later. The main problems are the lack of procedures/steps to regulate the production process from start to finish so that the image of